Skip to product information

Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

Specifications

Size
50 Foot
Color
Max Grip - Orange
View full details
4.8
★★★★★
Buyers' choice
AmandaOctober 3
★★★★★
Exactly as pictured
Ordered Tuesday, arrived Friday with tracking the whole way. The product matches the photos exactly and the quality is better than I expected for the price.
JamesOctober 2
★★★★★
My dog was nervous at first, but now he runs to me when he sees it. You can tell it is made with safe materials — no weird smell out of the box.
PriyaOctober 1
★★★★★
Great value
Compared the same type of product in local pet stores — here it is half the price and the quality is just as good. Packaging was neat, nothing damaged.
TomSeptember 29
★★★★★
Does the job well and my cat approves. Taking off one star only because delivery took a day longer than estimated — the product itself is great.
ElenaSeptember 28
★★★★★
Bought a second one as a gift for my sister after trying mine. Her puppy loves it too. Easy to clean, which is a big plus with pets.
DavidSeptember 27
★★★★★
Customer service answered my sizing question within an hour and helped me pick the right option. The product itself works exactly as described.
HannahSeptember 25
★★★★★
Gentle and safe
Very gentle, no sharp edges anywhere. My senior cat is picky about everything, but she accepted this right away.
RobertSeptember 23
★★★★★
Good product for the money. Works as advertised. I wish there were more color options, but that is a minor thing.
AishaSeptember 21
★★★★★
Cleanup is so much easier now. Everything wipes clean in seconds and there is no lingering odor. Highly recommend for multi-pet homes.
ChrisSeptember 19
★★★★★
Sturdy and well made — survived a week of sniffing and pawing by my very enthusiastic dog. Still looks brand new.
NinaSeptember 17
★★★★★
Second order
This is my second order because the first one was so good. Consistent quality, fast tracked shipping both times.
AlexSeptember 15
★★★★★
Solid product, does what it promises. Instructions could be a bit clearer, but I figured it out in a couple of minutes.